This project was developed as a result of the 2008 flooding. The city was successful in obtaining a Disaster Relief grant through Community Development Block Grant (CDBG). The project includes 6,300 linear feet of new storm sewer ranging in size from 12-inch to 30-inch diameter. The total project cost is estimated to be $700,000 and is 100% funded by CDBG funds.
Civil, Transportation, and Environmental Engineering; Construction Related Services; and Land Surveying based in southeast Iowa.
1501 S Main • PO Box 135 • Fairfield, IA 52556
641-472-5145